INSTALLATION INSTRUCTIONS WALL MOUNT ENERGY RECOVERY VENTILATOR WITH EXHAUST Models: ERVF-A3 CHERV-A3 ERVF-C3 CHERV-C3 For Use with Bard 2-1/2 through 3 Ton Wall Mount™ Air Conditioners and Heat Pumps Bard Manufacturing Company, Inc. Manual: 2100-512B Bryan, Ohio 43506 Supersedes: 2100-512A...
Bard W**A, W**H and C**H series shipping document to verify that the correct accessory wall-mounted units. The package consists of a unique has been shipped.
Heat/Cool in OFF position. 2. Remove the existing exterior blower access, filter C. Ventilator heat transfer wheels should rotate access and vent access panels on the Bard wall slowly (49 RPM). Intake and exhaust mount unit. Save the blower access and filter blowers should run.
Basic Installation 16. Replace the vent option access panel with the new panel provided. Attach air intake hood with screws (Factory-Installed Models) provided (see Figure 5 on page 10). Be sure to 1. Remove blower access, filter access and vent insert the top flange of the air intake hood into and option panels.
FIGURE 4 Control Panel INSTALL 1-480701-0 CAP AS SHOWN AND WIRE PER WIRING DIAGRAM TEMPORARY CONNECTION FOR TESTING. SEE RECOMMENDED CONTROL SEQUENCES LOW VOLTAGE WIRES FROM HEAT RECOVERY ASSEMBLY. MIS-2641 Manual 2100-512B Page 9 of 15...
For instance, do not use the ERVF-*3/CHERV-*3 and indoor blower during the high speed tap on a ERVF-A3 if only 250 CFM occupied periods of the day. of ventilation air is needed; use the low speed tap.
Proper cleaning of the Bard energy recovery maintenance of system performance and air quality. wheel will restore latent effectiveness to near original The need for periodic cleaning will be a function of performance.
Annual Maintenance 4. No re-lubrication is required to heat wheel bearings of the drive motor, or to the intake and exhaust 1. Inspect and conduct the same procedures as blower motors. outlined under Quarterly Maintenance. 5. If any belt chirping or squealing noise is present, 2.