Switch Installation - Cisco Catalyst 3750 Hardware Installation Manual

Hide thumbs Also See for Catalyst 3750:
Table of Contents

Advertisement

Switch Installation

This chapter describes how to start your switch and how to interpret the power-on
self-test (POST) that ensures proper operation. It describes the planning and
cabling considerations to keep in mind while planning your stack. It describes
how to install the switch and make connections to the switch. Read the topics and
perform the procedures in this order:
78-15136-03
Preparing for Installation, page 3-2
Verifying Switch Operation, page 3-10
Planning the Stack, page 3-14
Installing the Switch, page 3-19
Connecting StackWise Cable to StackWise Ports, page 3-38
Installing and Removing SFP Modules, page 3-41
Installing and Removing XENPAK Modules, page 3-45
Connecting to the 10/100 and 10/100/1000 Ports, page 3-51
Connecting to an SFP Module, page 3-55
Connecting to a XENPAK Module, page 3-59
Where to Go Next, page 3-61
C H A P T E R
Catalyst 3750 Switch Hardware Installation Guide
3
3-1

Advertisement

Table of Contents
loading

Table of Contents