Battery Installation - Panasonic LJ-SK56A Installation Manual

Lithium-ion storage battery system
Hide thumbs Also See for LJ-SK56A:
Table of Contents

Advertisement

4-3. Mounting of Lithium-ion Battery
Since the Lithium-ion battery is a heavyweight device, furthermore since it is a rechargeable device, be extremely
careful in handling it, and safely install it.
Do not modify or disassemble.
Do not allow water to enter the inside of the main body. Please pay special attention while it is raining or snowing.
Do not perform work when the scaffolding and/or your hands are wet.
Do not use a product that has been damaged due to dropping, etc.
Do not touch or short-circuit the POWER electrodes.
Do not stack batteries on top of each other that have been taken out of the packaging.
Wear insulating gloves and insulated shoes while doing the wiring work.
If the battery electrolytes are leaking, do not touch the liquid with your bare hands.
Tighten the
screws for each part with adequate torque.
Do not immerse the battery in liquids (water, sea water, oils, chemical waters ets.), or get it wet.
The work must be performed by
Install the battery after the base and main body installation has been completed.
Fix the screws using the appropriate tools.
Do not remove the connector cover until the wiring is started.

Battery Installation

1) Mounting the battery
On each battery, attach two battery fixing brackets that are included with the system.
For this purpose, use the bracket
[Tightening torque 0.65 - 0.85 N•m]
Bracket fixing screw x 8 / 1 battery
(M3 × 8)
personnel.
bracket
screws (M3 x 8) included with the system.
Bracket fixing bracket x 2 / 1 battery
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lj-sbk01Lj-na02

Table of Contents