This table shows the names and functions of the modules
Equipment Name
SN1729 PIMMJ
SN1730 PIMMK
COVER PARTS
ASSEM-A
SN1545
BASE
SN1731
BATTMH
UNIVERGE
2000 IPS Request For Proposal (RFP) Reference Guide
NEAX
Issue 6
Function Name
PIM
Port Interface Module (PIM)
Maximum 64 physical ports per PIM. Houses two batteries for
protection from short power interruption (for 30 minutes).
At maximum configuration, the system consists of eight PIM's,
and provides a total of 512 physical ports (64 ports × 8).
PIM
Port Interface Module (PIM) for Backup CPU System
Maximum 64 physical ports per PIM.
Houses two batteries for protection from short power
interruption (for 30 minutes).
One PIM is required per Backup CPU System.
COVER PARTS
Cover Parts Assembly
ASSEM
One cover parts assembly is required for each PIM.
BASE/TOP
Base/Top Cover Assembly
ASSEM
One base and top cover assembly is required for each stack.
BATTM
Battery Module for housing PIM or CS (ZT) backup batteries
Houses two pairs of batteries for protection from long power
interruption (for 3 hours).
.