Epo Port (Emergency Power Off); Network Transient Protector; Load Segments - Toshiba RELIABILITY IN MOTION 1000 Series User Manual

Single phase 1000 va to 3000 va uos
Hide thumbs Also See for RELIABILITY IN MOTION 1000 Series:
Table of Contents

Advertisement

port cannot be used when using the USB port. The USB cable is a standard cable and
may be purchased separately.
5.4

EPO Port (emergency power off)

A customer-supplied switch located remotely may be used to open the EPO connection
and force the UPS output receptacles to be switched off. The EPO function shuts down
the equipment immediately. An EPO will not provide an orderly shutdown. The UPS
will have to be manually restarted in order to regain power to the outlets.
After an Emergency Power Off (EPO), do not reset the breaker until the UPS has been
fully discharged. The UPS could be damaged if the unit is not fully discharged before
the breaker is reset.
5.5

Network Transient Protector

The network transient protector, located on the back panel, has both IN and OUT RJ45
10 baseT jacks and will protect a single network connector. Connect the input connector
to the jack labeled IN, and the output connector to the jack labeled OUT.
5.6

Load Segments

The sets of receptacles known as load segments provide organized shutdown and
startup of the equipment. Less critical equipment can be turned off during power
outages saving battery power for critical loads. The load group status can be viewed
from the LCD display and can be changed if necessary.
Load
1000VA Backup (min)
1500VA Backup (min)
2000VA Backup (min)
3000VA Backup (min)
10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
150
56
38
30
80
37
21
19
150
68
38
26
80
40
25
19
16
23
19
15
12
10
18
15
13
11
19
14
11
9
15
12
9
8
7
8
6
8
7
7
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents