Download Print this page

Step 1-Preparing The Workstation - HP Workstation xw4000 Series Hardware Installation

Rack mount tray installation
Hide thumbs Also See for Workstation xw4000 Series:

Advertisement

Step 1—Preparing the workstation
NOTE:
All illustrations are examples only. Workstation models vary. For product-specific
information, see the service guide for your HP workstation at
before beginning installation.
To prepare the workstation for component installation:
1.
Power down the workstation, and then disconnect the power cord.
2.
Power down all external devices, and then disconnect them from the workstation.
Step 2—Mounting the rails to the rack
1.
Attach the rails to the rack. See the rail installation instructions in this kit.
2.
If glide strips were not factory-installed, then apply them to the rail shelf.
a.
Remove the adhesive backing from the back of the glide strips.
b.
Apply a glide strip to the top surface of each rail.
Figure 1
Step 3—Attaching the rack mount tray to the workstation
1.
Using a T-15 Torx screwdriver, remove the indicated chassis screw (1) from the rear of the
workstation.
NOTE:
Figure 2
ENWW
Applying glide strips
For the HP Z200 Workstation, omit this step.
Removing the chassis screws
http://www.hp.com/support/manuals
Step 1—Preparing the workstation
3

Advertisement

loading

This manual is also suitable for:

Z400Z200 - small form factor workstation