Huawei NetCol5000-A050 User Manual page 253

In-row air cooled smart cooling product
Hide thumbs Also See for NetCol5000-A050:
Table of Contents

Advertisement

NetCol5000-A050 In-row Air Cooled Smart Cooling
Product
User Manual
Scenario
If the
equipment is
shut down,
issue a start
command to
start the
equipment.
NOTE
● For shutdown commands, the remote start/shutdown signal of the hardware port has
● If ON/OFF via NMS is disabled on the smart cooling product LCD, the device cannot be
Figure 12-1 Start/Shutdown over the LCD
Figure 12-2 Start/Shutdown over the ECC WebUI
Issue 13 (2023-08-20)
Operation
1. Check that the
remote start/
shutdown signal
status of the
hardware port is
start.
2. Set the start/
shutdown control
signal to start on
the smart cooling
product LCD, ECC
WebUI, or NetEco
WebUI.
the highest priority, and that of the smart cooling product LCD, ECC WebUI, and NetEco
WebUI has the same priority.
started or shut down over the ECC or NetEco.
Copyright © Huawei Digital Power Technologies Co., Ltd.
Start/Shutdown
Start/Shutdown
Signal Status -
Signal Status -
LCD/ECC/NetEco
Hardware Port
WebUI
Start
Start
12 FAQ
242

Advertisement

Table of Contents
loading

Table of Contents