JUPITER-(3000K, 6000K, 9000K)-H1 Smart
Transformer Station
User Manual
Figure 2-14 CGM.3 (DVC)
(1) Load switch operation
holes
(4) Cable clips
2.4.4.7 8DJH12/24 (CCV)
Issue Draft A
(2022-09-07)
NO TE
● The CCV ring main unit includes a circuit breaker cabinet and two load switch cabinets.
● The secondary room of the ring main unit cannot be opened when the power is on.
Copyright © Huawei Technologies Co., Ltd.
(2) Grounding switch operation
holes
(5) Ground bar
2 Products Description
(3) Cable connectors
-
27