Rubber Mats And Bushings - Bosch JLR-100-069 Original Instructions Manual

Scissors lift table
Table of Contents

Advertisement

en-gb | 42 | JLR-100-069
14. Perform steps 4 through 6 in reverse order to
reattach the static platform (3) to the scissors lift
table.
Tighten all six countersunk head screws (47) on
top of the static platform (3) with a torque of
26 Nm.
NOTICE
The scissors lift table could be damaged when
reinstalling the platforms!
The top frame or the platform itself could be
damaged when installing the platform in the
scissors lift table.
Position the spacers on the top frame so that
the screws can be inserted through the
spacers and into the top frame from above.
Align the extendible platform with the static
platform in the top frame as before.
15. Pull up the protective bellows (5).
16. Secure the protective bellows (5) to the top of
the scissors lift table with the M5 screws again.
Tighten the M5 screws by hand.
Close the snaps (34).
SP04006297 | 06/2021
6.9

Rubber Mats and Bushings

Figure 52: Platforms with Rubber Mats and Bushings
3
Platform (static) with Rubber Mat
4
Platform (extendible) with Rubber Mat
30
Bushings (10 pieces per set)
31
M10 Threaded Holes on Top of the Platforms
1.
Remove the bushings (30) from the rubber mats.
2.
Dispose of the rubber mat or bushings (30).
3.
Place the (new) rubber mat on the platform (3)
or (4). Secure the rubber mat to the platform (3)
or (4) with the (new) bushings (30) in the
threaded holes (31) on top of the platform (3) or
(4).
Bosch Automotive Service Solutions GmbH
Am Dörrenhof 1
85131 Pollenfeld-Preith
Germany

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents