Huawei FusionModule1000A40 Installation Manual page 130

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A40:
Table of Contents

Advertisement

FusionModule1000A40 Prefabricated All-in-One
Data Center
Installation Guide
Figure B-2 Fully weld along the joints.
Step 5 After the welding is complete, polish the welding joints. Use water to check for
leakage.
Figure B-3 polish the welding joints
Step 6 Clean the welding joints with alcohol, and add the paint (epoxy zinc rich primer
+epoxy intermediate paint+polyurethane topcoat) according to the procedure:
After the primer is dry, apply the epoxy intermediate paint. After the intermediate
paint is dry, apply the polyurethane topcoat.
----End
Issue 07 (2022-12-15)
Copyright © Huawei Digital Power Technologies Co., Ltd.
B Repairing the Pre-fab. Module