Haier GE APPLIANCES NF96US Installation Instructions Manual page 23

Warm air gas furnace upflow/ horizontal left/right air discharge direct vent & non-direct vent
Hide thumbs Also See for GE APPLIANCES NF96US:
Table of Contents

Advertisement

AIR
INTAKE
TYPICAL INTAKE PIPE CONNECTIONS IN HORIZONTAL DIRECT OR NON-DIRECT VENT
Intake Piping
Figure 27 through Figure 28
This gas furnace may be installed in either direct vent
or non-direct vent applications. In non-direct vent
applications, when intake air will be drawn into the furnace
from the surrounding space, the indoor air quality must be
considered and guidelines listed in Combustion, Dilution
and Ventilation Air section must be followed.
Follow the next two steps when installing the unit in Direct
Vent applications, where combustion air is taken from
outdoors and flue gases are discharged outdoors. The
provided air intake screen must not be used in direct vent
applications (outdoors).
507768-05G / 31-5000655
TYPICAL INTAKE PIPE CONNECTIONS IN UPFLOW DIRECT OR
NON-DIRECT VENT APPLICATIONS
2"
or
3"
TRANSITION
*2"
* When transitioning up in pipe size, use the shortest length of 2" PVC pipe possible.
NOTE: Exhaust pipe and intake pipe must be the same diameter.
Figure 27.
APPLICATION (RIGHT-HAND DISCHARGE SHOWN)
* When transitioning up in pipe size, use the shortest length of 2" PVC pipe possible.
NOTE: Exhaust pipe and intake pipe must be the same diameter.
Figure 28.
Pipe size determined in Table 5
2"
2"
2"
2"
or
2"
or
2"
2"
2"
2"
AIR
INTAKE
1. Use transition solvent cement or a sheet metal screw
to secure the intake pipe to the inlet air connector.
2.
Route piping to outside of structure. Continue with
installation following instructions given in general
guide lines for piping terminations and in intake and
exhaust piping terminations for direct vent sections.
Refer to Table 5A through Table 5D for pipe sizes.
Issue 2223
3"
TRANSITION
*2"
*2"
Page 23 of 56