Download Print this page

Huawei R250D Hardware Installation And Maintenance Manual page 15

Advertisement

R250D
Hardware Installation and Maintenance Guide
Figure 2-1 Installation flowchart
2.3 Unpacking the Equipment
Before unpacking the carton, ensure that the packing carton is intact and not damaged or
soaked. Stop unpacking if the equipment is rusted or soggy. Then, investigate causes and
contact the supplier.
After unpacking, check items in the carton against the packing list. If any item is missing,
contact the supplier or agent.
Usually, the packing list contains the following items.
l
l
l
l
l
l
l
2.4 Determining the Installation Position
l
Issue 01 (2016-09-30)
Remote Unit
Expansion screws
Screw
Quick start guide
Warranty card
MAC address label
SN label
Do not deploy the device in places with high temperature, dust, noxious gas, unstable
voltage, much vibrations, or strong noise, or in places near flammable or explosive
materials and interference sources such as a large radar station, radio station, and
transformer station.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2 AP Installation
9

Advertisement

loading

This manual is also suitable for:

50082920