6.

CLASSIFICATION OF INSTALLATION-RELATED WORK

* The field engineers should check and clarify the scope of the work and the allocation of
responsibilities.
6.1

Scope of Work to Be Executed by the Customer

The work listed below should be executed by the customer as a general rule.
See sections 7 to 9 for details concerning the execution of the work.
(1)
Construction work
(Refer to section 7.)
(2)
Electrical work
(Refer to section 8.)
(3)
Air conditioning
and plumbing system
(Refer to section 9.)
6.2

Scope of Work to Be Executed by Toshiba

(1)
Bringing-in, installation, and adjustment of the entire system
(2)
Intersystem wiring and cable connections to the customer's facilities
(3)
Installation of the InnerVision service processor and connection to the public telephone line
A.
New construction, extension, and reconstruction works of the
building
B.
X-ray shielding in the scanning room
Wall shielding
Door and frame shielding
Window and frame shielding
C.
Reinforcement for floor load
D.
Wiring pit and ducting
E.
Interior finish work of the building
A.
Power supply system
B.
Power distribution board
C.
Grounding
D.
"X-ray on" indication lamp during X-ray exposure, piping, and
wiring
E.
Interior illumination and dimmers
F.
Installation of a public telephone line jack for InnerVision
A.
Air conditioning work (heater, cooler, and ventilation)
B.
Water supply and drainage work (e.g., for a washstand)
20
No. 2A201-519EN*A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aquilion tsx-101a/h series

Table of Contents