10. Turning ON the High-Voltage Switch

1Y
Turn ON the high-voltage switch (S1) of the SCN08D board.

11. Installing and Cleaning the Covers

1Y
(1) By reversing the procedures described in "4. Removing the Covers," install all the
covers.
(2) Clean all the covers with a moistened cloth.
CHECKS
• Make sure that the screws on the covers are attached securely.
• Verify that there is no missing screw.
009-058-00
10.20.2000 FM2732 (2)
At intervals of one year, or when 60,000 IPs have been processed
SCN08D board
At intervals of one year, or when 60,000 IPs have been processed
Install and clean.
CR-IR347 Service Manual
HHS label #2
PM - 112
Turn ON.
ON position
High-voltage
switch
FR7H6925.EPS
PM - 112