Transporting The Units To The Place Of Installation - Siemens 8DA Installation Instructions Manual

Medium-voltage switchgear
Table of Contents

Advertisement

Preparing the switchgear
room
=USNJVOTPKV=G=fkpq^iiqflk=fkpqor`qflkp=Ua^=G=oÉîáëáçå=MP
Fig. 7:
Position of transport holes
!
Push the round bars into the transport holes at the front and at the rear.
!
Attach ropes or chains at the ends of the round bars.
!
Stretch the ropes or chains by lifting the transport tackle carefully.
!
If the ropes or chains are touching the transport unit, use transport tackle / expander.
!
Lift the transport unit carefully.
6.5

Transporting the units to the place of installation

DANGER!
Risk of falling down when crossing provisionally bridged floor openings with the
transport units.
!
Observe sufficient load-bearing capacity of the bridges.
!
Support bridges adequately.
!
Secure bridges against displacement.
!
Bridge floor openings that have to be crossed and prop up with adjustable supports.
!
Fix the bridges to secure them against displacement.
!
Clean the switchgear room. Special cleanliness is required.
!
Draw a marking line at the place of installation in order to align the switchgear.
!
Unpack the transport units inside the switchgear building. Do not unpack parts
supplied with the switchgear in order to avoid loss and damage.
fåëí~ää~íáçå
Fig. 8:
Marking of transport
holes
15