Download Print this page

Craftsman 247.24019 Operator's Manual page 12

Two bin gagger
Hide thumbs Also See for 247.24019:

Advertisement

Available languages

Available languages

7.
Open grass catcher cover by pushing in on the rear, right-side tab
with your right-hand, as seen in 1 of Fig. 19, and lifting with your
left-hand in the rear center, 2.
2
ASSEMBLY AnD InSTALLATIOn
Figure 17
Figure 18
1
Figure 19
8.
Install both grass bins onto the bin support assembly by inserting
the front edge in first (1), as seen in Fig. 20, and setting the back
edge down (2) until it fits into the assembly.
NOTE: The side of the grass bins with the tight mesh is intended to be
positioned facing forward.
9.
Install one of the rubber chute straps (723-04008A) onto the
discharge chute elbow using one of the supplied clevis pins (711-
05063), washer (736-0204) and Bow-tie cotter pins (710-04040)
from hardware pack 689-00092A. See Fig. 21. Secure the end
of the strap utilizing the hole furthest from the end, and insert the
torsion spring hook (732-04510A) from the same hardware pack
into the other end of the rubber strap.
10.
Install the deck mounting pin (711-05049) and two flat washers (736-
0176), from hardware pack 689-00092A, up into the chute elbow and
secure with a flange lock nut (712-04064), as seen in Fig. 21.
11.
Install the shoulder bolt (738-0754) into the chute elbow from the top
side and secure inside the chute elbow using a flange lock nut (712-
04063) from the same hardware pack (689-00092A). See Fig. 21.
12
1
2
Figure 20
Figure 21

Hide quick links:

Advertisement

loading