.
3
Installing the Product
NOTICE
Factory-provided cables are adequate for systems with Rack Frames bolted together. Different
configurations may require cable length modification.
.
90
Figure 3-112: Termination Resistor Setting for Last SMU
English 8/2020. Rev 0.3