Overview

Introduction

Your equipment is supplied ready to use after a few simple installation procedures described in detail in the
assembly instructions. It is important to read the information provided in this guide thoroughly and to ensure
complete compliance with all installation and operation requirements, safety procedures, warnings, cautions,
and local regulations. A well prepared site helps to provide a smooth and easy installation.

Customer responsibility

You are responsible for preparing the physical site for the installation of the equipment.
Prepare the building's electrical system to meet the equipment's requirements and the Electrical Code
requirements according to the local jurisdiction of the country where the equipment is installed. See
Electrical configuration on page
NOTE:
used to power the equipment. See
Meet temperature and humidity requirements and ensure proper ventilation for the equipment. See
Environmental specifications on page
Meet all requirements for RIP and networking. See
Networking on page
Prepare the unloading route so that the equipment can be unloaded and maneuvered into place. See
Unloading route on page

Installation time schedule

Allow a minimum of 1 hour for the installation. The installer may require the help of two people to perform
certain tasks during installation.
ENWW
5.
Make sure that a certified electrician reviews the setup and configuration of the electrical system
4.
2.
Electrical configuration on page
3.
RIP workstation characteristics on page 4
5.
Introduction
and
1

Advertisement

Table of Contents
loading

Table of Contents