POWERMOBIL/ARCOSKOP
Installation- and Setting Instructions
Area dose product measurement device
Print No.: SPR2-240.814.04.02.02
Replaces: SPR2-240.814.04.01.02
SP
© Siemens AG 1999
The reproduction, transmission or use
of this document or its contents is not
permitted without express written
authority. Offenders will be liable for
damages. All rights, including rights
created by patent grant or registration
of a utility model
_or_ design,_are_
reserved.
English
Doc. Gen. Date: 07.00

Advertisement

loading

Summary of Contents for Siemens POWERMOBIL

  • Page 1 POWERMOBIL/ARCOSKOP Installation- and Setting Instructions Area dose product measurement device © Siemens AG 1999 The reproduction, transmission or use of this document or its contents is not permitted without express written authority. Offenders will be liable for damages. All rights, including rights...
  • Page 2 When performing service work and tests, adhere to the general safety instructions, print number RA0-000.12.40 contained in Register 1 of the system binder, the product-specific safety information in the POWERMOBIL respectively ARCOSKOP as well as the safety information in the ARTD. After completing all service work and reattaching the covers, perform the protective conductor measurement as specified in ARTD-002.731.17.
  • Page 3: Installation

    Area dose product measurement device Installation • Disconnect the POWERMOBIL respectively ARCOSKOP from the mains power. • Remove the POWERPHOS cover. Without the laser targeting device: • Attach the Area dose product measurement device to the POWERPHOS using the screws included in the packaging.
  • Page 4 • Select the sub-menu "Save" and save the parameters on disk. • Exit the Memoskop service program. • Turn the POWERMOBIL/ARCOSKOP off and the on again to reset the serial interface. POWERMOBIL/ARCOSKOP SPR2-240.814.04 Page 4 of 10 Siemens AG Rev. 02 07.00...
  • Page 5 Read and record the value shown on the electronics unit of the area dose product measuring device. Programming • Connect the service PC to the serial interface of the POWERMOBIL/ ARCOSKOP. • Start the service program. • Select the "Adjustment, Parameter..." menu.
  • Page 6 This serves to recalibrate the electronics unit. Prerequisites • value is already programmed (see Programming). • Connect the service PC to the serial interface of the POWERMOBIL/ ARCOSKOP. • Start the service program. Select the "Adjustment, Calibrations..." menu. • Answer the query with "Yes".
  • Page 7 ) dose measuring chamber in the center of the I.I. (Fig. 4). Dose measurement • Press the "Next Pat" key to reset the area dose product display on the POWERMOBIL/ ARCOSKOP monitor to 0. • Select kV STOP and set 70 kV.
  • Page 8 Calculate the deviation between the measured area dose product and the displayed area dose product: The deviation must be < 0.3. Deviation = [(displayed area dose product FDPa) - (measured area dose product FDPg)] / (measured area dose product FDPg). POWERMOBIL/ARCOSKOP SPR2-240.814.04 Page 8 of 10 Siemens AG Rev. 02 07.00...
  • Page 9: Concluding Steps

    Perform the protective conductor measurement as specified in ARTD-002.731.17. • Perform partial acceptance tests in compliance with country-specific regulations. Changes to previous version Page 4 new Siemens AG SPR2-240.814.04 Page 9 of 10 POWERMOBIL/ARCOSKOP Medical Engineering Rev. 02 07.00 TD SD 24...
  • Page 10 Area dose product measurement device This page intentionally left blank. POWERMOBIL/ARCOSKOP SPR2-240.814.04 Page 10 of 10 Siemens AG Rev. 02 07.00 TD SD 24 Medical Engineering...

This manual is also suitable for:

Arcoskop