Siemens Cerberus PACE Compact Operation Manual page 49

Public address and controlled evacuation
Hide thumbs Also See for Cerberus PACE Compact:
Table of Contents

Advertisement

A6V11899865_en--_b
Function test
Carry out the function test at the specified intervals in accordance with the local
requirements and standards.
Perform the function test on site at the same time as the system acceptance
test
If the system is connected to a fire detection installation (FDI), the function test
must be performed with the FDI connected.
You can test the required visual and acoustic indicating elements according to
EN 54-16 by operating them manually in access level 1 or 2 in accordance with the
configuration of the VACIE.
Check the display and LED for any indication of shutdowns if corresponding
devices are part of the system.
Check the display by pressing the <Silence Buzzer/LED Test> button on
PT1001-A1 and PT1002-A1.
Check the keypad functions.
A full acceptance test must be performed after every time a change is made to
the system.
Testing interval
All indicating elements must be tested every six months.
Cleaning the control panels
To clean the control panels, use a wet cloth without any cleaning agents, abrasives
or solvents.
Commissioning and maintenance
16
49 | 54

Advertisement

Table of Contents
loading

Table of Contents