Clearance; Attachment To The Ground - Panasonic 140 Installation And Maintenance Manual

Heat pump chiller
Table of Contents

Advertisement

9.2. Clearance

When choosing the location for the ECOi-W, take care to
leave suffi cient free clearance on all sides to ensure easy
access for maintenance work.
The minimum free clearance dimensions indicated must be
observed to ensure both proper system operation and allow
access for maintenance and cleaning.
With buffer tank
2000
1500
When several ECOi-W units are installed, ensure proper clearance is implemented around the condensers
CAUTION
specifi c to each machine.

9.3. Attachment to the ground

The surface of the fl oor or structure located under the ECOi-W must be fl at, and with suffi cient strength to withstand the unit's
weight with its full liquid load, and occasional presence of maintenance equipment.
152
1145
152
1249
Without buffer tank
For normal applications, rigidity of the ECOi-W and the
positions of supports allow for an installation minimizing
vibrations. However, the installers can use anti-vibration
rubber pads (supplied optionally).
When fi tting anti-vibration pads, refer to the manual supplied with the kit.
5000
1500
1500
1249
1145
1500
1500
Without buffer tank
The ECOi-W does not require anchoring on the foundations,
except in regions exposed to a high earthquake risk or if the
device is installed on a high level on a steel frame.
With buffer tank
152
152
15
5000
1500
1500
1145
1249
1249
1145

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents