Bosch ConnectS2 User Manual page 21

Table of Contents

Advertisement

Connect S2 | Solar Frame | User Guide
Assembly steps:
1. Activate gateway
2. Connect Solar Frame connector to gateway
3. Insert the gateway into the Solar Frame from below
4. Mount the glue studs with flange nuts, tighten flange nuts hand-tight.
5. Close the screw holes with the plugs supplied
6. Prepare the surface according to the gluing instructions
7. Apply adhesive
8. Gluing the Solar Frame
9. Wait until the adhesive has cured before loading
10. Check that all four mounting points hold the Solar Frame
Exploded view
© Robert Bosch Manufacturing Solutions GmbH
Rear view
21 | 39
Side view
Bosch Connected Industry

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents