Commissioning A Uim20A Expansion Module - Huawei ECC800 User Manual

Data center controller
Hide thumbs Also See for ECC800:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual (for ECC800-Pro)
Figure 6-2 ECC800-Pro cascading page
Step 6 (Optional) Click the alarm bubble in the Active alarms area in a smart module to view the
corresponding active alarm information.
Step 7 (Optional) Click the pencil icon next to a smart module name, and the Edit Smart Module
Title dialog box is displayed. Change the smart module name and click Confirm.
Step 8 (Optional) Click Link in a smart module on the cascading page to access the corresponding
ECC800-Pro login page.
Step 9 (Optional) Filter and query the details of each alarm by smart module, device, or alarm
severity in the Active alarms area.
----End

6.3 Commissioning a UIM20A Expansion Module

Context
Devices connected through the UIM20A expansion module (UIM) can be automatically or
manually bound in the smart module view.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > Device Management and click Auto Discover Device to add the
device. Devices connected to the UIM can be identified.
Step 3 Click Smart Module View in Bind Cabinets and Devices.
Step 4 In the displayed dialog box for binding IT cabinets and devices, click Auto Bind to bind
devices.
Automatic binding is supported in the following scenarios:
Issue 06 (2020-04-22)
Copyright © Huawei Technologies Co., Ltd.
6 Feature Description
117

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecc800-pro

Table of Contents