Generation 2 builds on the powerful foundation of the TouchOne with an all new Processor, Notice on Power Consumption SmartColor display system, new touch panel and improved mounting design.
The Wall Mount should be screwed onto have a unique address between 1 and 4. When the TouchOne is powered on for the first the wall first using the included 6G x 20mm pan head screws in time, it defaults to address 1.
5. Setup Wizard 6. Internet Connectivity When the TouchOne is powered on for the first time, it will display a setup wizard, allowing During the setup wizard, you will be requested to connect the TouchOne to a local WiFi you to configure the device.
• Ensure the TouchOne is wired correctly and there is a steady 11V to 13V on the PWR and COM (Red and Black) wires (meter at the TouchOne side of the cable). Maximum screw...