30 | TCE 4460 | Initial commissioning
7. Connect the shorter pipes (2) to the joints coming
from the control lever of the 2 column switches.
2
!
Verify the correct functioning of the column switch,
if not, invert the pipes connection.
4.2.4

Put in place the vertical rod

1. Put a hand down on the protection cap (placed on
top of the rod) and press it downwards; with the
other hand remove the adhesive tape with the aid of
a cutter and remove the steel rod inserted between
the arm and mounting tool;
Danger!
The spring could eject violently the rod from
its housing, thus it might be a serious danger
for the operator.
Be careful when carrying out this operati-
on.
|
1 695 105 428
2010-02-16
4.2.5

Mounting the bead breaker arm

Danger!
Wrong mounting of the bead breaking cylin-
der compromises machine functioning and
can be a serious danger for the operator.
1. Remove the external elastic ring and take off the hin-
ge rod from its housing in the bead breaking arm.
2. Disconnect the fixing grain of the fixing bush with
hex key (1), rotate and unblock the fixing bush to re-
move pressure from the spring (2), remove the fixing
pin (3) and remove the adjusting bush from the bead
breaking cylinder rod (4).
1
3
2
4