Carefully inspect the UPS for shipping damage. Units shipped within North America and NAFTA are
shrink wrapped.
12
1. Remove shrink wrap.
2. Unbolt the rails from
both the unit and the
shipping pallet.
3. Place the rails on the
front of the pallet.
4. Attach the rails as shown to the front of
the pallet.
5
Use the four 1/2 x 3" bolts to secure the
rails to the shipping pallet.
6. Place the tie brackets in the slots at the
upper and lower ends of the ramps.
7
SLOWLY roll the unit down the ramp.
FIGURE 6.1 – UNSHIPPING 15-30KVA BATTERY CABINET
4400 Series UPS Battery Cabinet Installation and Operation Manual – 69445-005