Chapter 2 Preparations
Preparation
•
Checking rails
•
Installing inner and outer rails
Checking rails
Make sure the orientation of inner and outer rails by viewing labels on each rail.
Installing inner rails
1. Mount an inner rail marked as "R" to the right side of the server and "L" to the left side when viewed the
server from front.
2. Align the locks and holes, and insert the inner
rails until it clicks.
Installing outer rails
1. Mount an outer rail marked as "R" to the right side of the rack and "L" to the left side when viewed the
rack from front.
128
Inner rail
Outer rail
Express5800/R120e-1E User's Guide
2. Installation and Connection
Label