GE AKTAavant Getting Started page 81

Hide thumbs Also See for AKTAavant:
Table of Contents

Advertisement

Purge the system pumps
Follow the instruction below to purge System pump A and/or System pump B. Note that
both pump heads of each system pump have to be purged. Also, note that both system
pumps have to be purged after priming of buffer inlets.
TIP:
Step
1
Getting Started with ÄKTAavant and UNICORN 6 28-9440-69 AB
Prime all buffer inlets and purge System pump B before finally purging
System pump A with start buffer. The instrument is then ready for start
of a method run.
Action
In the Manual instructions dialog:
Select Pumps and pressures:Pump wash, and select one inlet from the
Inlet A or Inlet B drop-down list. Preferably, choose the buffer inlet to be
used in the beginning of the method run.
Click
.
Result: A pump wash of the selected inlet starts.
7 Prepare the system for a run
7.3 Prime buffer inlets and purge System pumps
81

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Unicorn 6

Table of Contents