4
3
1
a
1
2
a
2
1
2
5-11
CONTROL UNIT
RECTIFIER
1. Inspect:
9 Rectifier
Check for continuity between the termi-
nals.
Tester (+)
lead
1
Tester
(-) lead
1
2
—
3
—
4
—
Replace if any faults are found.
2. Install:
9 Rectifier 1
TIP
Engage rectifier 1 with notch a of fuel tank
bracket 2, and install them.
CONTROL UNIT
1. Install:
9 Control unit 1
TIP
Install control unit assembly 1 inside of pro-
jection a of base mount 2.
ELEC
2
3
4
1
1
1
1
—
—
—
1
—