Bosch e-GoKart PowerTrain Young Star Manual page 42

Table of Contents

Advertisement

6 | Wiring Harness instruction / Build up chassis
42 / 60
Fix the black box in the kart chassis at four points as shown in the following picture.
Illustration 36: 48 V wiring harness "fixing Points chassis"
Connect the 48 V wiring harness with the components in the chassis.
– Power Unit PU 5-10
– Energy Storage ES 5-2.4 "1"
– Energy Storage ES 5-2.4 "2"
Use cable fixers to fix the wiring harness to the chassis.
On the following picture, you can see how to place the wires. The turquoise box in the
rear area symbolizes the black box. The red lines symbolize the cables of the 48 V wiring
harness. They lead from the black box to the Power Unit PU 5-10 and the Energy Storages
ES 5-2.4.
Illustration 37: How to place the wires
The following picture shows the wiring from the black box to the Power Unit PU 5-10,
fixed after 50 to 100 mm.
e-GoKart_Powertrain__Young_Star__Manual
Bosch Motorsport

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents