Figure 3-15 Installing a server on holding rails
NOTE
–
Ensure that the inner rail is clipped into the middle rail, and then slowly push the chassis inside
until you hear a click, as shown in (1) in
–
If the inner rail is not clipped into the middle rail, the rolling balls and the holding rail may be
damaged as shown in (2) and (3) in
Figure 3-16 Clipping the inner rail into the middle rail
Press the release buttons on both sides, and push the server into the cabinet until the
server cannot move forward. See