Pre Commissioning Checks
Condenser Installation Condition
Condenser Access Condition
Indoor Unit Installation Condition
Indoor Unit Access
Sbox Installation Condition
Sbox Acces Condition
Power Status
Leak Tested Too
Duration
Pressure Tested Too
Duration
Strength Tested Too
Duration
Tripple Evacuated
Duration
Evacuation Reading (Must be 1.5 Torr or 0.5mb)
Notes