Panasonic FV-36RCQL1 Operating And Installation Instructions page 13

Table of Contents

Advertisement

Available languages

Available languages

Phase 1
(Fig. A)
(1) Place the support bar (A) on the wall at a height B from the cooking surface resulting from the sum of the quotas :
C + 22 15/16" (582 mm).
(2) With a spirit level, verify the horizontal alignment;
(3) Mark 2 screw positions at the ends of support bar.
(4) Fasten the support bar (A) with the 2 relative screws (V1 Ø5x50).
A
(2)
(1)
(2)
A
(3)
(4)
V1
2 - Ø5x50
(3)
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fv-30rcql1

Table of Contents