4.1.3 Removing the Instrument from its Sleeve
The instrument is designed to be removed from its sleeve from the front panel. However, if a USB memory stick
or the Ethernet cable is fitted then this must be removed first.
When the instrument is shipped from the factory it is fitted with two small red clips, one in the top side of the
sleeve and the other below. These are intended as a safeguard against removal of the instrument from its
sleeve when an Ethernet cable is fitted. These clips must also be removed, using a small screwdriver, before
the instrument can be taken out of its sleeve.
Ease the latching ears (Figure 2) outwards and pull the controller forward.
When plugging back in ensure that the latching ears click into place to maintain the panel sealing.
Panel cutout:
92mm x 92mm (both -0 + 0.8mm)
3.62in x 3.62in (both -0.00 + 0.03in)
Minimum inter-unit spacing:
Horizontal ('x') = 10mm (0.4in)
Vertical ('y') = 38mm (1.5in)
Page 10
FEC920: USER GUIDE
Latching
ears
Figure 2 Mechanical installation details (standard case)
A5E45696052A Rev-AA