Initial Setup - GE T2100-ST1 Operator's Manual

Hide thumbs Also See for T2100-ST1:
Table of Contents

Advertisement

Assembly and Setup
WARNING

Initial Setup

Tools required for assembly
The treadmill is shipped with the handrails loose, straddling the
treadmill frame. It is advised that you secure the handrails in their
proper location before removing the treadmill from the base of the
crate. This prevents the internal wires running down the handrail
mount to the motor pan from being cut.
1.
2.
28
The T2100-ST1 and T2100-ST2 treadmills each weigh 425 lbs.
When lifting the rear of the treadmill and rolling it on its front
wheels, you are moving 132 lbs. This can be accomplished by
one person, but each installer must evaluate whether he or
she is capable of moving this amount of weight without
causing strain or injury. If in doubt, a second person should be
recruited to assist.
If you are moving the treadmill over rough surface, such as
pavement, use a dolly under front of the treadmill to prevent
damage to the wheels and lift mechanism
 5/16 Allen wrench (supplied)
Swing the handrail assembly into the operating position and
insert (2) 3/8-16 bolts and 3/8 lock washer each side and
tighten securely.
Install (2) plastic caps each side for a finished look.
T2100-ST1 Treadmill, 110V / T2100-ST2 Treadmill, 220V
.
2097937-001 Rev E
12 June 2017

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

T2100-st2

Table of Contents