LG LV240HV4 Installation Manual page 24

Single zone vertical air handling unit
Table of Contents

Advertisement

GENERAL INSTALLATION GUIDELINES
Vertical Downflow Installation
Vertical Downflow Installation - continued
6. Install the conversion kit left and right rear vertical brackets in the rear corners of the cabinet (Figure 20).
7. Position the rear horizontal bracket on the two vertical brackets and secure with screws (Figure 21).
8. Position the left and right horizontal side brackets and secure with screws (Figure 21). The brackets are not
left/right hand dependent.
9. Position the front horizontal bracket and secure with screws (Figure 21).
10. Confirm all bracket screws are secure and the bracket assembly is correctly positioned to support the evap-
orator coil/drain pan assembly.
11. Route the wiring for the pipe in and pipe out sensors (Figure 22).
12. Carefully slide the evaporator coil/drain pan assembly back into the cabinet (Figure 23). Confirm the assem-
bly is against the rear panel of the cabinet.
Figure 20: Vertical Brackets.
Figure 22: Route Wiring.
Sensor
Wiring
24
Vertical
Bracket
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Figure 21: Horizontal Brackets.
Figure 23: Reinstall Coil Assembly.
Rear
Bracket
Side
Brackets
Front
Bracket
Evaporator
Coil/Drain
Pan Assembly

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lv180hv4Lv420hvLv360hv4Lv480hv

Table of Contents