DBS3900(ICR)
Installation Guide
3.
Step 2 Link the M6 OT terminal at one end of the PGND cable to the wiring terminal at the bottom of
the RRU, and leave the other end idle, as shown in
Issue 01 (2011-03-30)
Figure 14-2 Removing the screws
Reinstall the adapting piece and cover plate on the RRU, as shown in
Figure 14-3 Reinstalling the adapting piece and cover plate
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
14 Installing the RRU
Figure
14-4.
Figure
14-3.
14-3