Figure 14-2 Removing The Screws; Figure 14-3 Reinstalling The Adapting Piece And Cover Plate - Huawei DBS3900 Installation Manual

Indoor centralized rack (icr) dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900(ICR)
Installation Guide
3.
Step 2 Link the M6 OT terminal at one end of the PGND cable to the wiring terminal at the bottom of
the RRU, and leave the other end idle, as shown in
Issue 01 (2011-03-30)

Figure 14-2 Removing the screws

Reinstall the adapting piece and cover plate on the RRU, as shown in

Figure 14-3 Reinstalling the adapting piece and cover plate

Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
14 Installing the RRU
Figure
14-4.
Figure
14-3.