Main unit
3
LCD attachment
1. Attach the FFC 1 to the LCD 2.
*Key point
• Unlock the connector, insert the FFC 1, and then lock the
connector.
2. Attach the LCD 2 to operation panel A.
4
PCB attachment plate attachment
1. Position the LCD lead wire 1 and the SW PCB assembly lead wire 2 as
shown in the photo on the right.
2. Attach the PCB attachment plate 3 with the 6 screws 1.
1
3 - 4
Operation panel
Taptite, Bind B
M3X10
Torque
0.39 – 0.79 N-m
2
1
2
2
3
1
1