Sign In
Upload
Manuals
Brands
ABB Manuals
Protection Device
REG670 2.0 IEC
ABB REG670 2.0 IEC Manuals
Manuals and User Guides for ABB REG670 2.0 IEC. We have
1
ABB REG670 2.0 IEC manual available for free PDF download: Commissioning Manual
ABB REG670 2.0 IEC Commissioning Manual (268 pages)
Relion 670 series Generator protection
Brand:
ABB
| Category:
Protection Device
| Size: 3.55 MB
Table of Contents
Table of Contents
7
Section 1 Introduction
17
This Manual
17
Intended Audience
17
Product Documentation
18
Product Documentation Set
18
Dokumentenänderungsverzeichnis
19
Related Documents
20
Document Symbols and Conventions
20
Symbols
20
Document Conventions
21
IEC 61850 Edition 1 / Edition 2 Mapping
22
Section 2 Safety Information
31
Symbols on the Product
31
Warnings
31
Caution Signs
33
Note Signs
34
Section 3 Available Functions
35
Main Protection Functions
35
Back-Up Protection Functions
36
Control and Monitoring Functions
37
Communication
41
Basic IED Functions
43
Section 4 Starting up
45
Factory and Site Acceptance Testing
45
Commissioning Checklist
45
Checking the Power Supply
46
Energizing the IED
46
Checking the IED Operation
46
IED Start-Up Sequence
47
Energizing REX060
47
REX060 Start up Sequence
47
Setting up Communication between PCM600 and the IED
47
Writing an Application Configuration to the IED
53
Checking CT Circuits
54
Checking VT Circuits
55
Using the RTXP Test Switch
55
Checking the Binary Input/Output Circuits
56
Generator Protection REG670 2.0 IEC Commissioning Manual
56
Binary Input Circuits
56
Binary Output Circuits
56
Checking Optical Connections
56
Section 5 Configuring the IED and Changing Settings
59
Overview
59
Configuring Analog CT Inputs
60
Supervision of Input/Output Modules
60
Section 6 Calibrating Injection Based Sensitive Rotor Earth Fault Protection
63
Commissioning Process
63
Commissioning Tool ICT
63
Launching Injection Commissioning Tool (ICT)
65
Performing Calibration
67
Acquiring References
69
Verifying Calibration
70
Auditing
72
Editing Features in Graph
73
Logging Measurements to File
74
Section 7 Calibrating Injection Based 100% Stator Earth Fault Protection
77
Commissioning Process
77
Commissioning Tool ICT
77
Launching Injection Commissioning Tool (ICT)
80
Performing Calibration
81
Acquiring References
83
Verifying Calibration
85
Auditing
86
Editing Features in Graph
88
Logging Measurements to File
89
Section 8 Establishing Connection and Verifying the SPA/IEC Communication
91
Entering Settings
91
Entering SPA Settings
91
Entering IEC Settings
91
Verifying the Communication
92
Verifying SPA Communication
92
Verifying IEC Communication
92
Fibre Optic Loop
93
Optical Budget Calculation for Serial Communication with SPA/IEC
93
Section 9 Establishing Connection and Verifying the LON Communication
95
Communication Via the Rear Ports
95
LON Communication
95
The LON Protocol
96
Hardware and Software Modules
96
Optical Budget Calculation for Serial Communication with LON
98
Section 10 Establishing Connection and Verifying the IEC 61850 Communication
99
Overview
99
Setting the Station Communication
99
Verifying the Communication
100
Section 11 Testing IED Operation
101
Preparing for Test
101
Requirements
101
Preparing the IED to Verify Settings
102
Activating the Test Mode
103
Preparing the Connection to the Test Equipment
104
Connecting the Test Equipment to the IED
104
Releasing the Function to be Tested
105
Verifying Analog Primary and Secondary Measurement
106
Testing the Protection Functionality
107
Section 12 Testing Functionality by Secondary Injection
109
Testing Disturbance Report
109
Introduction
109
Disturbance Report Settings
109
Disturbance Recorder (DR)
109
Event Recorder (ER) and Event List (EL)
110
Identifying the Function to Test in the Technical Reference Manual
111
Differential Protection
111
Transformer Differential Protection T3WPDIF
111
Verifying the Settings
111
Completing the Test
112
High Impedance Differential Protection HZPDIF
112
Verifying the Settings
112
Completing the Test
113
Generator Differential Protection GENPDIF
113
Verifying the Settings
113
Completing the Test
114
Restricted Earth-Fault Protection, Low Impedance REFPDIF
114
Verifying the Settings
114
Completing the Test
115
Impedance Protection
115
Full Scheme Distance Protection, Mho Characteristic ZMHPDIS109
115
Distance Protection Zones, Quadrilateral Characteristic
116
Zmfpdis
116
Measuring the Operating Limit of Set Values in Cases Without Shaped Load Encroachment Characteristics (Operationldcmp=Off)
119
Completing the Test
120
Measuring the Operating Time of Distance Protection Zones
120
Distance Protection Zones, Quadrilateral Characteristic ZMFCPDIS
120
Measuring the Operate Time of Distance Protection Zones
124
Measuring the Operating Limit of Set Values in Cases Without Shaped Load Encroachment Characteristics (Operationldcmp=Off)
124
Completing the Test
125
Pole Slip Protection PSPPPAM
125
Verifying the Settings
125
Completing the Test
128
Out-Of-Step Protection OOSPPAM
128
Verifying the Settings
129
Fwdr Fwdx
133
Test of Point RE
133
Test of the Boundary between Zone 1 and Zone 2, Which Is Defined by the Parameter Reachz1
137
Test of the Point SE (R Rvsr , X Rvsx )
141
Loss of Excitation LEXPDIS
146
Verifying the Settings
146
Completing the Test
148
Under Impedance Protection for Generator ZGVPDIS
148
Verifying the Settings
148
Completing the Test
151
Rotor Earth Fault Protection with RXTTE4 and General Current and Voltage Protection CVGAPC
152
Testing
152
Completing the Test
154
Current Protection
154
Instantaneous Phase Overcurrent Protection 3-Phase Output PHPIOC
154
Measuring the Operate Limit of Set Values
154
Completing the Test
155
Four Step Phase Overcurrent Protection 3-Phase Output OC4PTOC
155
Verifying the Settings
155
Completing the Test
156
Instantaneous Residual Overcurrent Protection EFPIOC
156
Measuring the Operate Limit of Set Values
157
Completing the Test
157
Four Step Residual Overcurrent Protection, (Zero Sequence or Negative Sequence Directionality) EF4PTOC
157
Four Step Directional Earth Fault Protection
157
Four Step Non-Directional Earth Fault Protection
158
Completing the Test
158
Four Step Negative Sequence Overcurrent Protection NS4PTOC
158
Completing the Test
159
Sensitive Directional Residual Overcurrent and Power Protection SDEPSDE
159
Measuring the Operate and Time Limit for Set Values
160
Completing the Test
165
Thermal Overload Protection, Two Time Constants TRPTTR
165
Checking Operate and Reset Values
165
Completing the Test
166
Breaker Failure Protection, Phase Segregated Activation and Output CCRBRF
166
Checking the Phase Current Operate Value, IP
166
Checking the Residual (Earth Fault) Current Operate Value IN> Set below IP
167
Checking the Re-Trip and Back-Up Times
167
Verifying the Re-Trip Mode
167
Verifying the Back-Up Trip Mode
168
Verifying Instantaneous Back-Up Trip at CB Faulty Condition
169
Verifying the Case Retripmode = Contact
169
Verifying the Function Mode Current&Contact
170
Completing the Test
170
Pole Discordance Protection CCPDSC
170
Verifying the Settings
171
Completing the Test
171
Directional Underpower Protection GUPPDUP
172
Verifying the Settings
172
Completing the Test
173
Directional Overpower Protection GOPPDOP
173
Verifying the Settings
173
Completing the Test
174
Negative-Sequence Time Overcurrent Protection for Machines NS2PTOC
174
Verifying Settings by Secondary Injection
174
Completing the Test
176
Accidental Energizing Protection for Synchronous Generator AEGPVOC
176
Verifying the Settings
176
Verifying the Settings
177
Voltage-Restrained Time Overcurrent Protection VRPVOC
177
Completing the Test
180
Generator Stator Overload Protection GSPTTR
180
Verifying the Settings
180
Completing the Test
181
Generator Rotor Overload Protection GRPTTR
181
Verifying the Settings
181
Completing the Test
182
Voltage Protection
182
Two Step Undervoltage Protection UV2PTUV
182
Verifying the Settings
182
Completing the Test
184
Two Step Overvoltage Protection OV2PTOV
184
Verifying the Settings
184
Completing the Test
185
Extended Testing
185
Two Step Residual Overvoltage Protection ROV2PTOV
185
Verifying the Settings
185
Completing the Test
186
Overexcitation Protection OEXPVPH
186
Verifying the Settings
186
Check of Undervoltage Levels
187
Completing the Test
187
Voltage Differential Protection VDCPTOV
187
Check of Voltage Differential Trip and Alarm Levels
189
Check of Trip and Trip Reset Timers
190
100% Stator Earth Fault Protection, 3Rd Harmonic Based STEFPHIZ
191
Completing the Test
191
Final Adjustment of Compensation for VT Ratio Differences
191
Testing
192
Verifying Settings
193
Completing the Test
194
Frequency Protection
194
Underfrequency Protection SAPTUF
194
Verifying the Settings
194
Completing the Test
195
Overfrequency Protection SAPTOF
195
Verifying the Settings
195
Completing the Test
196
Rate-Of-Change Frequency Protection SAPFRC
196
Verifying the Settings
196
Completing the Test
197
Frequency Time Accumulation Protection Function FTAQFVR
197
Verifying the Settings
197
Completing the Test
199
Multipurpose Protection
199
General Current and Voltage Protection CVGAPC
199
Built-In Overcurrent Feature (Non-Directional)
200
Overcurrent Feature with Current Restraint
200
Overcurrent Feature with Voltage Restraint
200
Overcurrent Feature with Directionality
201
Completing the Test
202
Over/Undervoltage Feature
202
Secondary System Supervision
202
Current Circuit Supervision CCSSPVC
202
Verifying the Settings
202
Checking that the Binary Inputs and Outputs Operate as Expected
203
Completing the Test
203
Fuse Failure Supervision FUFSPVC
203
Measuring the Operate Value for the Negative Sequence Function
204
Measuring the Operate Value for the Zero-Sequence Function
205
Checking the Operation of the Du/Dt and DI/Dt Based Function
206
Measuring the Operate Value for the Dead Line Detection Function
206
Completing the Test
207
Fuse Failure Supervision VDSPVC
207
Completing the Test
208
Control
208
Synchrocheck, Energizing Check, and Synchronizing SESRSYN
208
Testing the Synchronizing Function
210
Testing the Synchrocheck Check
211
Testing the Energizing Check
213
Testing the Voltage Selection
215
Apparatus Control APC
217
Completing the Test
217
Voltage Control (VCTR) TR1ATCC, TR8ATCC, TCMYLTC, TCLYLTC
218
Check the Activation of the Voltage Control Operation
220
Secondary Test
220
Check the Normal Voltage Regulation Function
221
Check the Undervoltage Block Function
221
Check the Overcurrent Block Function
222
Check the Upper and Lower Busbar Voltage Limit
222
Single Transformer
223
Parallel Voltage Regulation
224
Completing the Test
228
Interlocking
228
Single Command, 16 Signals SINGLECMD
228
Logic
229
1Ph/3Ph Operating Mode
229
Three-Phase Operating Mode
229
Tripping Logic, Common 3-Phase Output SMPPTRC
229
1Ph/2Ph/3Ph Operating Mode
230
Circuit Breaker Lockout
232
Completing the Test
232
Integrator TIGAPC
232
Monitoring
233
Completing the Test
233
Gas Medium Supervision SSIMG
233
Liquid Medium Supervision SSIML
233
Testing the Liquid Medium Supervision for Alarm and Lock out Conditions
233
Breaker Monitoring SSCBR
234
Completing the Test
234
Testing the Liquid Medium Supervision for Alarm and Lock out Conditions
234
Verifying the Settings
235
Completing the Test
236
Completing the Test
237
Event Function EVENT
237
Limit Counter L4UFCNT
237
Metering
237
Function for Energy Calculation and Demand Handling ETPMMTR
237
Pulse-Counter Logic PCFCNT
237
Verifying the Settings
238
Completing the Test
239
Station Communication
239
Multiple Command and Transmit MULTICMDRCV / MULTICMDSND
239
Remote Communication
239
Binary Signal Transfer Binsignreceive, Binsigntransm
239
Basic IED Functions
241
Parameter Setting Group Handling SETGRPS
241
Verifying the Settings
241
Completing the Test
242
Exit Test Mode
242
Section 13 Checking the Directionality
243
Overview
243
Testing the Directionality of the Distance Protection
243
Section 14 Commissioning and Maintenance of the Fault Clearing System
247
Commissioning Tests
247
Periodic Maintenance Tests
247
Visual Inspection
248
Maintenance Tests
248
Preparation
248
Alarm Test
249
Recording
249
Secondary Injection
249
Self Supervision Check
249
Trip Circuit Check
249
Measurement of Service Currents
250
Restoring
251
Section 15 Troubleshooting
253
Checking the Self Supervision Signals
253
Checking the Self Supervision Function
253
Determine the Cause of an Internal Failure
253
Self Supervision HMI Data
253
General IED Status
253
Fault Tracing
254
Internal Fault Indications
254
Using Front-Connected PC
255
Repair Instruction
256
Troubleshooting
257
Repair Support
258
Maintenance
258
Section 16 Glossary
259
Advertisement
Advertisement
Related Products
ABB REG650 ANSI
ABB Relion REG670
ABB RELION REG615
ABB REG670 Customized
ABB REG670 A20
ABB REG670 B30
ABB REG670 C30
ABB REG316 4 Series
ABB REJ601
ABB REF611
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL