Sign In
Upload
Manuals
Brands
ABB Manuals
Inverter
Fimer PVI-10.0/12.5-TL-OUTD-FS
ABB Fimer PVI-10.0/12.5-TL-OUTD-FS Manuals
Manuals and User Guides for ABB Fimer PVI-10.0/12.5-TL-OUTD-FS. We have
1
ABB Fimer PVI-10.0/12.5-TL-OUTD-FS manual available for free PDF download: Product Manual
ABB Fimer PVI-10.0/12.5-TL-OUTD-FS Product Manual (107 pages)
Brand:
ABB
| Category:
Inverter
| Size: 17.28 MB
Table of Contents
Introduction and General Information
4
Warranty and Supply Conditions
4
Not Included in the Supply
4
Table of Contents
5
Contents
5
Reference Number Index
8
Graphical Representation of References
8
Scope and Target Audience
9
Purpose and Document Structure
9
List of Appendix Documents
9
Operator and Maintenance Personnel Skills/Prerequisites
9
Symbols Ad Signs
10
Field of Use, General Conditions
11
Intended or Allowed Use
11
Limits in Field of Use
11
Improper or Prohibited Use
11
Characteristics
12
General Conditions
12
Models and Range of Equipment
13
Identification of the Equipment and the Manufacturer
14
Characteristics and Technical Data
16
Tightening Torques
19
Overall Dimensions
19
Bracket Dimensions
20
Efficiency Curves
21
Power Derating
22
Power Derating Due to Environmental Conditions
22
Power Reduction Due to the Input Voltage
23
Characteristics of a Photovoltaic Generator
24
Strings and Arrays
24
Description of the Equipment
25
Operating Diagram
25
Connection of Several Inverters Together
26
Notes on the Sizing of the System
26
Functionality and Components of the Equipment
27
Topographic Diagram of the Equipment
28
Safety Devices
30
Anti-Islanding
30
Input Fuses
30
Ground Fault of the Photovoltaic Panels
30
Other Safety Devices
30
Safety and Accident Prevention
31
Safety Information and Instructions
31
Hazardous Areas and Operations
32
Environmental Conditions and Risks
32
Signs and Labels
32
Thermal Hazard
33
Clothing and Protective Devices for Staff
33
Residual Risks
34
Table of Residual Risks
34
Lifting and Transport
35
General Conditions
35
Transport and Handling
35
Lifting
35
Unpacking and Checking
35
List of Components Supplied
36
Weight of the Groups of Device
37
Installation
38
General Conditions
38
Environmental Checks
39
Installations above 2000 Metres
39
Installation Position
40
Wall Mounting
41
Operations Preparatory to PV Generator Connection
42
Checking the Correct Polarity of the Strings
42
Checking of Leakage to Ground of the Photovoltaic Generator
42
Choice of Differential Protection Downstream of the Inverter
42
Independent or Parallel Input Channels Configuration
44
Channel Configuration Examples
45
Independent Channel Configuration (Default Configuration)
46
Parallel Channel Configuration
46
Input Connection to PV Generator (DC Side)
47
String Protection Fuses (-FS Model Only)
49
Sizing of Fuses
49
Installation Procedure for Quick Fit Connectors
51
Grid Output Connection (AC Side)
55
Characteristics and Sizing of the Line Cable
55
Load Protection Switch (AC Disconnect Switch)
56
Connection to the AC Side Terminal Board
56
Communication and Control Board
57
Connections to the Communication and Control Board
58
Serial Connection Communication (RS485)
59
Procedure for Connection to a Monitoring System
60
Remote Control Connection
61
Configurable Relay Connection (ALARM)
61
Instruments
62
General Conditions
62
Description of Keyboard and LED Panel
63
Operation
64
General Conditions
64
Monitoring and Data Transmission
65
User Interface Mode
65
Types of Data Available
65
Measurement Tolerance
65
Commissioning
66
Display Access and Settings
68
LED Behaviour
69
Specifications on the Operation of the Leds
70
LED Insulation Fault
70
Description of the Menus
71
General Information
71
Statistics Menu
73
Settings Menu
75
Info Menu
83
AUTOTEST Procedure in Accordance with Standard CEI 0-21
84
Running the Tests from the Display Menu
84
Maintenance
86
General Conditions
86
Routine Maintenance
87
Troubleshooting
87
Alarm Messages
87
Power Limitation Messages
94
Registration on "Registration" Website and Calculation of Second-Level Password (Service Menu)
96
Resetting the Time Remaining to Change the Grid Standard
99
Replacing the Input Fuses (Version -FS)
100
Replacement of the Buffer Battery
102
Verification of Ground Leakage
103
Behaviour of a System Without Leakage
103
Behaviour of a System with Leakage
104
Measuring the Insulation Resistance of Photovoltaic Generator
105
Storage and Dismantling
106
Storage of the Equipment or Long Period of Non-Use
106
Dismantling, Decommissioning and Disposal
106
Contact Us
107
Advertisement
Advertisement
Related Products
ABB Fimer PVI-10.0/12.5-TL-OUTD
ABB Fimer PVI-10.0/12.5-TL-OUTD-S
ABB PVI-10.0-TL-OUTD
ABB PVI-12.5-TL-OUTD
ABB PVI-6000-TL-OUTD
ABB PVI-6000-TL-OUTD-S
ABB PVI-3.0-OUTD-S-US-A
ABB PVI-3.0-OUTD-US
ABB PVI-3.0-OUTD-S-US
ABB PVI-5000-TL-S-US-A
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL