PTO Manifold Service

5 ft- -lb
(6.7 N- -m)
20 ft- -lb
(27 N- -m)
20 ft- -lb
(27 N- -m)
50 ft- -lb
(67 N- -m)
RH DECK PTO MANIFOLD SHOWN
1. PTO manifold body
2. NWD SAE #4 plug with O- -ring
3. Orifice (0.063) (port OR)
4. #8 zero leak plug with O- -ring
NOTE: The ports on the manifold are marked for easy
identification of components. Example: S is the deck so-
lenoid valve and P1 is the gear pump connection port.
(See Hydraulic Schematic in Chapter 9 -- Foldout Draw-
ings to identify the function of the hydraulic lines and car-
tridge valves at each port location).
The control manifolds for the three (3) cutting decks are
very similar. The front deck control manifold does not in-
clude an orifice (item 3). Note: When servicing the deck
control manifolds, DO NOT interchange parts from one
control manifold to another.
Hydraulic System
8
7
6
5
4
5. Relief valve (port RV2)
6. Solenoid valve (port S)
7. Solenoid coil
8. Nut
9
10
3
Figure 88
Page 4 - - 124
20 ft- -lb
(27 N- -m)
25 ft- -lb
(34 N- -m)
25 ft- -lb
11
(34 N- -m)
1
20 ft- -lb
(27 N- -m)
2
9. Relief valve (port RV1)
10. Spool logic cartridge (port LC2)
11. Spool logic cartridge (port LC1)