General Descriptions For Pm Procedure; Preventive Maintenance (Pm) - Toshiba e-STUDIO203 Service Handbook

Hide thumbs Also See for e-STUDIO203:
Table of Contents

Advertisement

4.

PREVENTIVE MAINTENANCE (PM)

4.1

General Descriptions for PM Procedure

Perform the preventive maintenance in the following timing.
e-STUDIO163: every 72,000 sheets
e-STUDIO203: every 90,000 sheets
(1)
Preparation
Ask the user about the current conditions of the equipment and note them down.
Before starting maintenance, make some sample copies and store them.
Turn OFF the power and make sure to unplug the equipment.
(2)
Perform a preventive maintenance using the following checklist and illustrations. Refer to the
Service Manual if necessary.
(3)
Plug in the equipment after the maintenance has been finished. Then turn ON the power and
make some copies to confirm that the equipment is working properly.
December 2005 © TOSHIBA TEC
e-STUDIO163/203 PREVENTIVE MAINTENANCE (PM)
4 - 1
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-studio163

Table of Contents