Test Run - Toshiba BMS-SM1280HTLE Service Manual

Smart manager
Hide thumbs Also See for BMS-SM1280HTLE:
Table of Contents

Advertisement

12

TEST RUN

Start the system to perform operation check by following the procedure below.
12-1.Preparation
No.
Item
1
Peparation
2
Device installation
3
Wiring
4
Device setting
5
Setting file upload
6
Client PC setting
Details
Discuss with a customer to determine details of the
following.
• Select devices, and creat a system diagram
• Determine the addresses of an air conditioner and
interfaces, and creat an address management
table
• Set an IP address of Smart Manager
• Creat a setting file with the Setting File Creation
Software
Install Smart Manager and the interfaces.
Connect the power cables, ground wires, and signal
wires to Smart Manager and the interfaces.
Set the air conditioner and the interfaces.
1) Air conditioner
Address setting
2) Energy Monitoring
Address setting, RS-485
termination resistance
Relay Interface
setting
3) Digital Input / Output
Address setting, RS-485
termination resistance
Relay Interface
setting
1) Upload the setting file.
2) After the change, reset Smart Manager.
Configure network and browser setting of the client
PCs.
Refer to the Owner's manual of the Setting
File Creation Software.
Refer to "INSTALLATION OF THE SMART
MANAGER" (page 12) in this manual.
For further details, refer to the Installation
manual of each device.
Refer to "CONNECTION OF POWER
CABLES / EARTH WIRES /
COMMUNICATION CABLES" (page 15) in
this manual.
For further details, refer to the Installation
manual of each device.
Set the address of the devices according to
the address management table.
Refer to "SWITCHES FOR SETTING (Smart
Manager)" (page 20) in this manual.
For further details, refer to the Installation
manual of each device.
For further details, refer to the setting file
creation software.
For further details, refer to the Network
Configuration Guide of Smart Manager.
29
Procedure

Advertisement

Table of Contents
loading

Table of Contents