II. UNPACKING AND SETUP
II-1. e-STUDIO206L/256/306/356/456
Push the process unit into the e-STUDIO as far as it goes. Secure it with 2 hand
screws.
Close the front cover and the ADU.
© TOSHIBA TEC CORPORATION 2012 All Rights Reserved.
SETUP FOR DEVELOPER UNIT
Sub Menu
22