Electrolux EN19WI30LS Installation Manual page 20

Condensing tankless gas water heater
Hide thumbs Also See for EN19WI30LS:
Table of Contents

Advertisement

Vent Pipe Installation (When supplying combustion air from the indoors (SV, non-direct vent))
supplied from the indoors as illustrated to the right. Refer to page 29 for
the location of the dip switch bank.
property damage, personal injury or death.
Horizontal Vent Termination- PVC/CPVC Materials Only
Exhaust
Slope vent
Intake
SV Conversion Kit
Accessory
(#SV-CK-3)
**1' (0.3m) Minimum
Inlet screen
90 Elbow
* Not supplied with water
heater, order separately.
**1' (0.3m) Minimum
recommended, but not required.
Pipe Material
Max. Straight Vent Length
No. of Elbows
4" (100mm) Pipe
4
35' (10.8m)
3
41' (12.6m)
2
47' (14.4m)
1
53' (16.2m)
*** Not including the termination.
Vertical Vent Termination- PVC/CPVC Materials Only
Support
Exhaust
Intake
SV Conversion Kit
Accessory
Slope vent
(#SV-CK-3)
Upwards
Inlet screen
**1' (0.3m)
Minimum
90 Elbow
**1' (0.3m) minimum
WARNING
3" Min.
Hanger
Straps
Insert Bird
Upwards
Screen* in
Each End
of Tee
PVC or CPVC
***
3" (75mm) Pipe
35' (10.8m)
41' (12.6m)
47' (14.4m)
53' (16.2m)
Insert Bird
Screen* in
End of 90
Elbow
Storm
Collar
Roof
Flashing
Firestop/Support
Firestop
Hanger
Strap
* Not supplied with water
heater, order separately.
recommended, but not required.
.
A tee, 45 elbow, or the PVT-HL termination may be used
for the vent termination. It is not necessary to use bird
screens with the PVT-HL termination.
Terminate at least 12" (300mm) above grade or above
snow line.
Terminate at least 7' (2.1m) above a public walkway,
6' (1.8m) from the combustion air intake of any appliance,
and 3' (0.9m) from any other building opening, gas utility
meter, service regulator etc.
Terminate at least 3' (0.9m) above any forced air inlet within
10' (3m) , 4' (1.2m) below, 4' (1.2m) horizontally from or
1' (0.3m) above any door, window, or gravity air inlet into any
building per National Fuel Gas Code ANSI Z223.1/NFPA 54.
Slope the horizontal vent 1/4" upwards for every 12" (300mm)
toward the termination.
Use a condensation drain if necessary.
In the Commonwealth of Massachusetts a carbon monoxide
detector is required for all side wall horizontally vented gas
fuel equipment.
Please refer to Technical Bulletin TB 010606 for full installation
instructions.
When installed in a manufactured home, all combustion air
must be supplied from the outdoors as shown on pages 15 - 17.
Terminate at least 6' (1.8m) from the combustion air
intake of any appliance, and 3' (0.9m) from any other
building opening, gas utility meter, service regulator etc.
Enclose exterior vent systems below the roof line to limit
condensation and protect against mechanical failure.
When the vent penetrates a floor or ceiling and is not
running in a fire rated shaft, a firestop and support is
required.
When the vent termination is located not less than
8' (2.4m) from a vertical wall or similar obstruction,
terminate above the roof at least 2' (0.6m), but not
more than 6' (1.87m), in accordance with the National
Fuel Gas Code ANSI Z223.1/NFPA 54.
Provide vertical support every 3' (0.9m) or as required
by the vent pipe manufacturer's instructions.
A short horizontal section is recommended to prevent
debris from falling into the water heater.
When using a horizontal section, slope the horizontal
vent 1/4" upwards for every 12" (300mm) toward the
termination to drain condensate.
When installed in a manufactured home, all combustion air
must be supplied from the outdoors as shown on pages 15 - 17.
* Dip switch No.3 is turned on.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ep19wi30ls

Table of Contents