Download Print this page

Tools And Materials Required; Mounting The Rails - HP 3 Phase UPS User Manual

Hp 3 phase ups user guide
Hide thumbs Also See for 3 Phase UPS:

Advertisement

Tools and Materials Required

The following tools are needed:
• #3 Phillips screwdriver bit
• Metric tools
— 7 mm
— 8 mm
— 10 mm
— 13 mm
— 14 mm
• Multimeter
The following items are supplied with the HP rack:
• Screws
• Cage nuts
• Cage nut-fitting tool
Unpacking the ERM
Transport the packaged ERM to its installation location. Unpack
the ERM near the rack where it will be assembled. Follow the
unpacking instructions on the carton. Verify that all components
are present.
WARNING: The battery modules are charged from the factory; do
not touch the metal contacts inside the connector.

Mounting the Rails

The ERM must be mounted on the fixed rails supplied in this kit.
To mount the rails:
1. Loosen the wing nuts (1) and extend the brackets (2) to the
desired length. Tighten the wing nuts slightly to stabilize the
bracket.
2
1
2. Use the rack template tool to measure and mark the screw
locations for the rails on the front and rear of the rack.
3. Use the cage nut tool to install the cage nuts in the rear
rack-mounting rails.
4. Insert at least one screw through each rack-mounting rail and
into the front of each rail.

Advertisement

loading