Hitachi NC40G - 1 1/2" Concrete Nailer Instruction And Safety Manual page 16

Gas concrete nailer
Hide thumbs Also See for NC40G - 1 1/2" Concrete Nailer:
Table of Contents

Advertisement

Available languages

Available languages

English
THE PUSH LEVER AND TRIGGER MUST MOVE
SMOOTHLY with pulling back the feeder knob.
Push lever
(2) Installing the battery.
Do not operate the push lever or trigger while installing
the battery.
Make sure the battery indicator light is flashing green.
If the battery indicator light is flashing red, the battery
doesn't have enough power and it needs to be charged.
Handle
Insert
BATTERY INDICATOR LIGHT
Flashing GREEN: Enough power remaining (The light
turns steady during operation).
Flashing RED: Insufficient power remaining (The light
turns steady during operation).
OFF: The battery is extremely empty. Charge the
battery.
(3) INSERT FUEL CELL INTO NAILER.
1 Pulling the latch and open the cell cover.
Trigger
Feeder knob
Battery
Latch
Pull out
Battery indicator
light
Latch
Cell cover
2 Insert the fuel cell into nailer.
Fuel cell
3 Insert the stem of fuel cell into the hole of adaptor.
Adapter
Adapter
4 Close the cell cover.
(4) Remove the finger from the trigger and press the push
lever against the workpiece with pulling back the
feeder knob.
THE NAILER MUST NOT OPERATE.
Depress
push lever
— 16 —
Stem
Fuel cell
Stem
Fuel cell
Cell cover
Do not pull trigger
Feeder knob

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nc 40g

Table of Contents