TeamPoS 3000 XL and XL
2. Place the 133UQ or 133AU keyboard on the ledge for the keyboard,
Stacked LCD
Filler Bracket
Keyboard Cable
3. Run keyboard cable under the Central Filler. The keyboard cable should be positioned
behind the Central Filler bracket as shown. Do not seat the keyboard on the bracket until
the LCD, filler(s) and LCD are installed.
D900000145
2
Issue 3
Installation
Back of 133UQ Keyboard
5-76