5.1.2 Installation Environment Check

Check the site requirements one by one, and start installation only after all
requirements are met. The Company will not be liable for any consequences in the
case that the installation environment does not meet the requirements.
Mark the safe zone: Use red caution belts to delimit a safe zone, clean up
obstacles in the safe zone, and place construction signs and warning signs in
prominent positions.

5.2 Unpacking and Acceptance

● After placing the equipment in the installation position, unpack it with care to
● After unpacking, check whether the fastening components and removable
● The blue adhesive plastic film on the outdoor air conditioner unit of the ESS is

5.3 Installing the ESS

5.3.1 Determining the Installation Position of the ESS

Prerequisites
Issue 15 (2023-11-01)
NO TICE
NO TICE
prevent scratches. Keep the equipment stable during unpacking.
components are loose. If they are loose, notify the carrier and manufacturer
immediately.
used to prevent foreign objects from entering the air conditioner unit during
storage. Do not remove the blue adhesive plastic film during storage. Remove
the blue adhesive plastic film before power-on and commissioning.
The site requirements are met.
Check and adjust the height of the concrete platforms to ensure that the
height difference between the upper surfaces of all platforms does not exceed
5 mm.
NO TICE
Ensure that the concrete platforms meet requirements.
Determine the installation position and orientation of the ESS based on site
conditions.