Siemens NTWRK-ENCL Installation Instructions Manual
Siemens NTWRK-ENCL Installation Instructions Manual

Siemens NTWRK-ENCL Installation Instructions Manual

Network enclosure

Advertisement

Quick Links

Installation Instructions
Model NTWRK-ENCL
Network Enclosure
Siemens Industry, Inc.
A6V12412370_en--_a
Smart Infrastructure

Advertisement

Table of Contents
loading

Summary of Contents for Siemens NTWRK-ENCL

  • Page 1 Installation Instructions Model NTWRK-ENCL Network Enclosure Siemens Industry, Inc. A6V12412370_en--_a Smart Infrastructure...
  • Page 2: Table Of Contents

    Power Connections to the Scalance XC206-2SFP-MM/-SM ..........9 CONFIGURATION......................10 Configuration of the PAD-4 ....................10 Configuration of the Scalance XC206-2SFP-MM/-SM ............10 SUPERVISION ........................11 Supervision of the Scalance XC206-2SFP-MM/-SM ............11 Supervision of the PAD-4 and Battery ................11 Siemens Industry, Inc. A6V12412370_en--_a Smart Infrastructure...
  • Page 3 Figure 1–1: Network Enclosure ........................4 Figure 2–1: Network Enclosure Specifications ................... 5 Figure 2–2: Network Enclosure Component Placement ................6 Figure 2–3: Mounting the Scalance XC206-2SFP-MM/-SM ............... 7 Figure 3–1: PAD-4 to Scalance Switch Power Connection ................ 9 Siemens Industry, Inc. A6V12412370_en--_a Smart Infrastructure...
  • Page 4: Introduction

    DMS, located in a distance via fiber optic cables connected between Scalance XC206-2SFP-MM or XC206-2SFP-SM Ethernet Network switches. The Network Enclosure (NTWRK-ENCL) is required for installation of the Scalance XC206-2SFP-MM/-SM switch when a Management Station is not located within 20 feet (6.1 m) in a closed conduit from a VNT mounting plate VNT-MP installed in a CAB2 or CAB3 enclosure for Desigo Fire Safety Modular/Cerberus PRO Modular panels.
  • Page 5: Installation

    6. Mark, drill, and install the two bottom bolts in the enclosure. 7. Tighten all four bolts securely against the back wall of the enclosure. 8. Place the batteries in the bottom of the Network Enclosure. Figure 2–1: Network Enclosure Specifications Siemens Industry, Inc. A6V12412370_en--_a Smart Infrastructure...
  • Page 6: Installing The Pad-4, Power Supply, And Battery

    Batteries: Remove the six ¼-20 nuts and the battery bracket as shown in the cabinet. Set the batteries with terminals facing each other on the bottom of the cabinet as shown and replace the bracket and six ¼-20 nuts. Siemens Industry, Inc. A6V12412370_en--_a Smart Infrastructure...
  • Page 7: Scalance Xc206-2Sfp-Mm/-Sm Network Switch Installation

    NOTE: The switch should be located between the two DIN rail standoffs. Configuration of the Scalance XC206-2SFP-MM/-SM Refer to the Scalance XC206-2SFP-MM Multimode and XC206-2SFP-SM Single Mode Ethernet Fiber Switch Installation Instructions, Document ID A6V12198161, for details on the switch configuration. Siemens Industry, Inc. A6V12412370_en--_a Smart Infrastructure...
  • Page 8: Wiring

    Switch Installation Instructions, Document ID A6V12198161, for details on the fiber optic connections. Power and Battery Connection to the PAD-4 Refer to the PAD-4 Manual, P/N 315-050217, for details on the installation of power and battery connections to the PAD-4. Siemens Industry, Inc. A6V12412370_en--_a Smart Infrastructure...
  • Page 9: Power Connections To The Scalance Xc206-2Sfp-Mm/-Sm

    Network Enclosure Installation Instructions Power Connections to the Scalance XC206-2SFP-MM/-SM Figure 3–1: PAD-4 to Scalance Switch Power Connection Siemens Industry, Inc. A6V12412370_en--_a Smart Infrastructure...
  • Page 10: Configuration

    Refer to the PAD-4 Manual, P/N 315-050217, for details on the configuration of the PAD-4. Configuration of the Scalance XC206-2SFP-MM/-SM Refer to the Scalance XC206-2SFP-MM Multimode and XC206-2SFP-SM Single Mode Ethernet Fiber Switch Installation Instructions, Document ID A6V12198161, for details on the configuration of the Scalance XC206-2SFP-MM/-SM. Siemens Industry, Inc. A6V12412370_en--_a Smart Infrastructure...
  • Page 11: Supervision

    HTRI-D/-S or XTRI-D/-S or equivalent monitored by the FACP. Any UL-listed fire system dry contact may be used for the contact monitoring. Refer to the PAD-4 Manual, P/N 315-050217, for details on the installation of the PAD-4 in the Enclosure. Siemens Industry, Inc. A6V12412370_en--_a Smart Infrastructure...
  • Page 12 Use of versions that are no longer supported, and failure to apply the latest updates may increase your exposure to cyber threats. Siemens strongly recommends to comply with security advisories on the latest security threats, patches and other related measures, published, among others, under https://www.siemens.com/cert/en/cert-security-advisories.htm.
  • Page 13 Siemens Industry, Inc. Siemens Canada, Ltd. Document ID A6V12412370_en--_a Smart Infrastructure 1577 North Service Road East Florham Park, NJ Oakville, Ontario L6H 0H6 Canada...

This manual is also suitable for:

S54465-c85-a1S54465-c84-a1

Table of Contents